Tender glossary for Bangladesh
Plain meanings of 39 words bidders meet in Bangladesh tenders. Figures and rates come from PPR 2025 as checked in the rule tracker; where the rules data has no figure, the entry says to check the tender document. Guidance only, not legal advice: the tender document and the official notice govern.
e-GP electronic Government Procurement
Bangladesh's national online procurement system at eprocure.gov.bd. Buyers publish tenders on it, and bidders buy the tender documents and submit their bids through it. Its use has been compulsory since 28 September 2025.
BPPA Bangladesh Public Procurement Authority
The government authority for public procurement. It issues the standard tender documents and circulars on how the rules apply, and operates e-GP.
PPA Public Procurement Act, 2006
The law for public procurement in Bangladesh; the procurement rules are made under it. Its recent amendments are listed in the rule tracker.
PPR Public Procurement Rules
The rules made under the act: procurement methods, securities, evaluation and contracts. The Public Procurement Rules, 2025 replaced PPR 2008 on 28 September 2025.
PE Procuring Entity
The government office or organisation that is buying. It publishes the tender, evaluates the bids and signs the contract.
HOPE Head of the Procuring Entity
The head of the buying organisation, who takes the decisions the rules reserve for that post, such as approving certain awards.
APP Annual Procurement Plan
A buyer's plan of what it intends to buy in the financial year, package by package, with planned dates and estimates where published. A plan can change and is not an invitation to bid.
Package
One procurement as the buyer plans and advertises it, with its own number in the plan and the notice. A package may be split into lots.
Lot
A part of a package that can be bid for and awarded separately. The tender document says whether you may bid for one lot or must bid for all.
OTM Open Tendering Method
The main method: the tender is advertised publicly and any eligible bidder may submit. In domestic procurement a price more than 10% above the official cost estimate is rejected, and low prices are tested against a floor (see significantly low-priced tender).
LTM Limited Tendering Method
Tendering among enlisted firms only. It may be used for domestic works up to Tk 5 crore and for goods, physical services and single service contracts up to Tk 50 lakh. For works, a bid more than 5% below or above the official estimate is cancelled.
Limited tendering price band
In limited tendering for works, the window of 5% either side of the official estimate inside which a bid must fall. On an estimate of Tk 100 lakh, valid bids run from Tk 95 lakh to Tk 105 lakh.
RFQ Request for Quotation
A simpler method in which the buyer asks for price quotations, usually for small purchases. For the value limits, and for whether a tender security is asked for, check the tender document.
DPM Direct Procurement Method
Buying from a single supplier without competition, allowed only in the cases the rules set out. For when it applies and its limits, check the tender document and the rules.
Framework agreement
An agreement with one or more suppliers that fixes terms for a period, under which the buyer places orders as it needs them. PPR 2025 widened its use.
STD Standard Tender Document
BPPA's model tender documents, one for each type and method of procurement. The buyer fills in the details of its tender, mostly in the Tender Data Sheet.
TDS Tender Data Sheet
The part of the tender document with this tender's own details: deadlines, the tender security, the documents to submit and their format. Where it differs from the general instructions, follow it.
BOQ Bill of Quantities
The list of items and quantities in a tender, against which the bidder writes a rate for each item. The priced BOQ makes up the tender price.
Official cost estimate
The buyer's own estimate of what the procurement should cost. The tender security ceiling, the limited tendering band and the low-price floor are all measured against it.
Tender security also called bid security
Money the bidder lodges with the tender, as a bank draft, pay order or bank guarantee, to show it will not withdraw. The tender document states it as a fixed amount within 3% of the official estimate, and it must stay valid at least 28 days after the tender validity ends.
Tender validity
How long a submitted tender stays open for the buyer to accept, generally 60 to 150 days. The exact period is in the Tender Data Sheet.
Performance security
A guarantee the winning bidder provides before signing the contract, kept until the work is done. It is 10% of the contract value for goods and 5% for works without an advance payment; other rates are in the calculator.
Retention money
Part of each payment the buyer holds back until the defects liability period ends: 5% of each bill for works and physical services, and 10% of the final bill for goods.
Defects liability period
A period after completion during which the contractor must put right any defects. Its length is set in the contract: check the tender document. Retention money is refunded within 28 days after it ends.
Front loading
Pricing the early items of a contract high and the later ones low, so more money is paid early. If a tender is found front-loaded, the contractual security can rise to 25% of the contract value.
Significantly low-priced tender SLT
In domestic open tendering, a price below a floor worked out from the other responsive prices, the official estimate and a 28-day e-GP price index. Every price below the floor is rejected, so no percentage below the estimate is safe in itself.
TOC Tender Opening Committee
The committee that opens the submitted tenders at the stated time and records what was received.
TEC Tender Evaluation Committee
The committee that checks each tender against the tender document, finds the responsive ones, compares their prices and recommends the award.
Responsive tender
A tender that meets the essential requirements of the tender document. Only responsive tenders are compared on price, and the lowest evaluated price among them wins.
Tie equal lowest evaluated price
When tenders tie at the lowest evaluated price, the bidder with the better past performance with that buyer is chosen. Only in limited tendering for works is a tie settled by lottery, which ranks up to 3 bidders.
See: Rule tracker: ties
NOA Notification of Award
The buyer's notice to the successful bidder that its tender is accepted. The bidder then provides the performance security and signs the contract within the time the tender document sets.
JV Joint venture
Two or more firms bidding together to combine turnover, experience and capacity. Each tender sets its own joint venture rules; a local partner is compulsory in joint ventures for international competitive tendering.
Enlistment
Being on a buyer's list of approved suppliers, contractors or service providers. Limited tendering is open only to enlisted firms.
Re-tender
A tender the buyer advertises again after the first round ended without a contract, for example because no tender was responsive.
Corrigendum amendment
A change the buyer issues to a live tender, such as a revised specification, a corrected BOQ or a new deadline. It is part of the tender: read it before you submit.
Liquidated damages
An amount fixed in the contract that the buyer deducts for late delivery or completion. For the rate and the cap, check the tender document. A record of liquidated damages can count against a bidder in a tie.
See: Rule tracker: ties
Physical services
Services with a physical, measurable output, such as cleaning or outsourced service workers, as opposed to consultancy. They have been a separate category of procurement since 28 September 2025.
Debarment
A ban on a firm taking part in public procurement for a period, for example after fraud or corruption. PPR 2025 set up a Debarment Board.
EOI and RFP Expression of Interest; Request for Proposal
The usual steps for consultancy: consultants send an expression of interest to be shortlisted, and the shortlisted firms then receive a request for proposal for their technical and financial proposals.